top of page

Floor Preparation Project-Roughening of Concrete Floor

Floor Preparation Project-Roughening of Concrete Floor


Floor Preparation Project-Roughening of Concrete Floor


The goal of this project is to roughen the surface of an existing concrete floor to improve bonding for subsequent coatings, adhesives, or other flooring systems. Proper surface preparation is essential to ensure that new layers, such as paints, adhesives, or overlays, properly adhere and perform as expected.

Here’s a step-by-step guide to roughening a concrete floor with a grinder:


1.Assessment of the Concrete Surface:

Before beginning, assess the existing condition of the concrete:

  • Look for cracks, stains, and any contaminants such as oil, grease, or dirt.

  • Determine the required roughness level, which is typically measured using the Concrete Surface Profile (CSP) scale. A CSP 2-3 is generally acceptable for most coatings and adhesives.

  • Ensure there are no areas that need patching or extensive repairs before roughening.


2.Select the Diamond Segment:

These are the most common tools for roughening concrete with a grinder. Select the right coarseness (grit):

  • Coarse grit (6-12 segments): For aggressive grinding and fast removal of material.

  • Medium grit (14-18 segments): For creating a standard level of roughness.

  • Fine grit (20+ segments): For smoothing after the roughening step or preparing for a polished finish.


3.Preparation and Safety Measures:
  • Personal Protective Equipment (PPE):

    • Wear safety glasses, ear protection, a dust mask (preferably a respirator), heavy-duty gloves, and steel-toe boots.

  • Floor Preparation: Clear the area of furniture, debris, and any loose items. If using a walk-behind grinder, ensure the floor is free from large cracks or obstructions.


4.Grinding the Concrete Floor:

Start at one end of the room and move methodically, making sure to keep the grinder at a steady pace. Make multiple passes if necessary, ensuring the grinder is always in motion to avoid gouging the concrete.

  • For optimal results, maintain medium pressure while grinding, as too much pressure can lead to uneven results or damage to the surface. Too little pressure may not create enough roughness for bonding.

  • Work in overlapping sections to ensure uniformity, and check frequently for consistency of the roughness.

  • Periodically stop and check the surface to ensure that the correct surface profile (CSP) is achieved.